Estimating Accuracy and Speed

Matthew Mangold

Matthew Mangold

Roofing Business Coach

August 30, 2023 6 min read
Share:

Estimating Accuracy and Speed: The Competitive Advantage

The estimate that takes 5 days loses to the one delivered in 24 hours. The estimate that misses cost by 15% destroys margin. Estimating speed without accuracy loses money. Accuracy without speed loses deals.

Mastering both creates competitive advantage that compounds with every bid.

The Estimating Problem

Roofing estimating presents a fundamental challenge: you must commit to a price before you truly know the costs.

Variables that affect actual cost:

  • Roof complexity beyond visible assessment
  • Hidden damage or conditions
  • Weather during installation
  • Material price fluctuations
  • Crew productivity variation
  • Access challenges
  • Change orders and scope creep

Consequences of poor estimating:

  • Too high: lose deals to competitors
  • Too low: lose money on won deals
  • Too slow: lose deals to faster competitors
  • Inconsistent: unpredictable profitability

The goal is reliable accuracy delivered quickly.

Measuring Estimating Performance

Track these metrics to understand current performance.

Accuracy metrics:

  • Gross margin variance (estimated vs. actual)
  • Material cost variance
  • Labor hour variance
  • Win/loss reason tracking

Speed metrics:

  • Average time from inquiry to estimate delivered
  • Estimates delivered same day percentage
  • Response time by estimate request type

Outcomes:

  • Close rate by estimator
  • Average job size by estimator
  • Margin achieved by estimator

Tracking reveals patterns that guide improvement.

The Estimation Process

Systematic estimation produces more consistent results.

Step 1: Information Gathering

Collect everything needed before site visit.

Pre-visit research:

  • Property records (age, permits, history)
  • Satellite imagery for preliminary measurement
  • Customer reported issues
  • Previous work if past customer

Customer questions:

  • What prompted this inquiry?
  • What’s the timeline?
  • Budget expectations?
  • Decision-makers involved?
  • Previous estimates received?

Step 2: Site Assessment

Thorough inspection enables accurate pricing.

Inspection elements:

  • Roof measurement (ground or drone verified)
  • Pitch and accessibility assessment
  • Current material condition
  • Substrate inspection if accessible
  • Flashing and penetration inventory
  • Ventilation assessment
  • Underlying structure concerns

Documentation:

  • Photo documentation of key areas
  • Measurement verification
  • Condition notes
  • Access challenges
  • Special requirements

Step 3: Scope Definition

Define exactly what’s included and excluded.

Scope components:

  • Tear-off or overlay
  • Materials to be used
  • Areas included
  • Work sequences
  • Warranty coverage
  • Cleanup and disposal

Clear exclusions:

  • What’s specifically not included
  • What would trigger change order
  • Assumptions being made

Step 4: Cost Calculation

Build estimate from accurate component costs.

Cost components:

Materials:

  • Shingles/roofing material
  • Underlayment
  • Flashing
  • Ventilation
  • Fasteners and accessories
  • Waste factor (10-15% typical)

Labor:

  • Crew hours at loaded rate
  • Account for complexity factors
  • Include supervision time
  • Factor setup and cleanup

Equipment/Overhead:

  • Dump fees
  • Equipment rental if needed
  • Permit costs
  • Insurance allocation
  • Overhead recovery

Step 5: Pricing

Add margin to cost for final price.

Pricing factors:

  • Target gross margin
  • Market conditions
  • Competitive situation
  • Customer relationship
  • Project desirability

Quality checks:

  • Does price per square foot align with standards?
  • Is margin within target range?
  • Are there unusual cost elements to verify?

Step 6: Proposal Delivery

Package and present the estimate.

Proposal elements:

  • Professional formatting
  • Clear scope description
  • Itemized or bundled pricing
  • Material specifications
  • Timeline expectations
  • Payment terms
  • Warranty information
  • Company qualifications

Delivery approach:

  • In-person presentation preferred
  • Walk through the proposal
  • Answer questions
  • Ask for the business

Improving Accuracy

Several practices improve estimating accuracy.

Standardized Measurement

Measurement systems:

  • Satellite measurement services (EagleView, Roofr)
  • Drone measurement technology
  • Standardized manual measurement process

Benefits:

  • Consistent measurement approach
  • Reduced measurement errors
  • Faster initial assessment
  • Documentation for reference

Historical Data Analysis

Track and analyze:

  • Actual vs. estimated hours by job type
  • Material usage vs. estimate
  • Callbacks and their causes
  • Profitable vs. unprofitable job patterns

Apply learnings:

  • Adjust labor factors based on data
  • Refine waste calculations
  • Identify high-risk job types
  • Update pricing accordingly

Pre-Pricing Review

Quality control steps:

  • Second set of eyes on larger estimates
  • Checklist verification
  • Sanity check calculations
  • Margin verification

Post-Job Analysis

Systematic review:

  • Every job compared to estimate
  • Significant variances investigated
  • Lessons documented
  • Estimates adjusted

Improving Speed

Faster estimates win more business. Here’s how to accelerate.

Pre-Built Templates

Template elements:

  • Standard materials packages
  • Labor calculations by job type
  • Pre-written scope descriptions
  • Standard exclusions and terms

Template types:

  • By roof type (shingle, flat, metal)
  • By job size (small repair, full replacement)
  • By product line

Technology Acceleration

Tools that speed estimation:

  • Measurement services that deliver same-day
  • Estimating software with pricing databases
  • Mobile-friendly estimate creation
  • Electronic signature capability

Process Streamlining

Speed improvements:

  • Same-day estimate commitment
  • Estimate preparation before site visit
  • Template population from inspection
  • Immediate delivery capability

Delegation

Scalable estimation:

  • Train additional estimators
  • Use assistants for data entry
  • Separate measurement from pricing
  • Review-only for experienced estimators

Balancing Speed and Accuracy

The fastest estimate isn’t valuable if it’s wrong. Find the optimal balance.

Speed-accuracy trade-offs:

  • More time on complex jobs
  • Less time on routine replacements
  • Templates for speed, customization for accuracy
  • Technology for speed, judgment for accuracy

Quality floor: Never sacrifice accuracy below acceptable threshold for speed.

Speed ceiling: Diminishing returns beyond certain speed. 24-hour turnaround captures most value.

Training Estimators

Consistent estimation requires consistent training.

Training components:

  • Measurement techniques
  • Material knowledge
  • Labor estimation
  • Pricing strategy
  • Proposal presentation
  • Objection handling

Development path:

  1. Shadow experienced estimators
  2. Assisted estimation with review
  3. Independent estimation with review
  4. Full independence

Ongoing calibration:

  • Regular accuracy review
  • Coaching on variances
  • Best practice sharing
  • Market updates

Common Estimating Mistakes

Mistake 1: Optimistic labor estimates Most underestimate labor. Use actual data, not hope.

Mistake 2: Insufficient waste factor Real waste exceeds estimates. Factor conservatively.

Mistake 3: Ignoring complexity factors Steep pitch, limited access, multiple penetrations add time and cost.

Mistake 4: No post-job analysis Without feedback, estimates never improve.

Mistake 5: Prioritizing speed over accuracy Winning unprofitable jobs destroys margin.

Start Here

Estimating improvement starts with measurement.

Start Here:

  1. Calculate your current estimation accuracy. Pull 10 recent jobs and compare actual cost to estimate.
  2. Measure your average time from inquiry to estimate delivered. What’s realistic vs. current?
  3. Identify your biggest accuracy gap. Is it labor? Materials? Scope creep?

Estimating accuracy and speed determine winning and profitability. The company that estimates well wins the right jobs at the right price.

Build systems for consistent estimation. Train your team on those systems. Measure and improve continuously. Estimating excellence compounds into competitive advantage.